100A → 200A · 1 DAY
From 100 amps to 200 — in a single day.
Permitted, inspected, labeled, and combed. Power back on by dinner.

What this covers.
Capacity for today
EVs, heat pumps, and induction ranges need amps your 1980s panel doesn't have.
Permits handled
We pull the permit, meet the inspector, and hand you the passed report.
Whole-home surge
Every upgrade includes panel-level surge protection.
Labeled to the letter
Every breaker mapped and printed. Your future electrician will thank us.
From $2,400 installed — the written quote is exact before any work starts.
0% APR for 12 months on this work. Prequalify in minutes without touching your credit score.
“Panel swap passed inspection first try. The inspector actually complimented the wire management before he signed it.”
Quoted in writing. Done to code.
Written quote within one business day. Permits and inspections handled.